Heavy Haulage TPMS: How to Specify It

· 6 min read

Specifying a tyre pressure system for a heavy haulage machine is a drawing exercise, not a catalogue order. The wheel count, the places a receiver is allowed to sit and the length of the chassis decide the system; the sensor is the last thing to choose. This four-step method is the one behind the heavy haulage TPMS solution on our main page.

Why a heavy haulage machine is not a truck with more axles

A truck that loses a tyre pulls into the next bay. A heavy haulage combination cannot: the load is usually one indivisible unit — a transformer, a wind component, a bridge girder — and the route, the permits and the escorts are planned around that load. A soft tyre on axle seven becomes a route event, not a service event, and on a close-coupled trailer it loads its neighbours within minutes.

Three more things make it a different specification. Axle spacing is dense: twenty axles occupy a length that would take four on a rigid truck, so many wheel positions sit in each other's shadow. The chassis is long and made of steel, so 433.92 MHz must cross thirty to forty metres of metal and cargo to reach the last axle. And the machine is assembled per move: a modular trailer rebuilt for the next load has a different wheel layout, and the monitoring system must follow the assembly rather than a fixed vehicle.

The system is computed from the axle layout; the sensor is chosen last.

Step 1: start with the wheel-position list

Everything else is computed from this list, so it has to be complete and stable:

  • how many axles, and how many wheels on each — a 160-wheel machine is typically 20 axles at eight wheels each
  • single, dual or super-single tyres, because that decides the sensor type and the valve arrangement
  • which axle groups exist in each assembly, since a modular trailer is rebuilt for different loads
  • one numbering scheme for positions, agreed once and never renumbered

A total such as "160 wheels" is not enough to specify from. A list with groups is.

Step 2: agree where the receiver is allowed to sit

On a heavy haulage trailer the receiver cannot go wherever the radio would like it. It needs a flat surface, DC 10–30 V and a cable path along the original loom. It is sealed to IP68, but should not sit where it will be hit, immersed or buried under the load. The permitted places are usually the gooseneck, the first axle group, a deck edge or a tool box.

The customer's design authority must say which are allowed before a repeater plan means anything; a radio-perfect position is useless if the trailer design permits no mount there.

Step 3: read the blind spots, then count repeaters

With the wheel list and the permitted mounts, the blind spots become visible: positions whose data cannot reach the receiver through steel, axle groups and cargo. Each cut-off group defines a radio zone, and each zone boundary is where a repeater goes.

That is why "one repeater every four axles" is not an answer, and why we ask for the drawing. The reference 160-wheel, 20-axle beam carrier in service uses twelve repeaters along the chassis; a 224-wheel machine (28 axles × 8) gives a repeater chain from the same method, not from a ratio. The same geometry logic applies on larger OTR tyres, where the paths are just as blocked — see mining and OTR machines.

The plan is verified at commissioning, position by position, and recorded. A written record turns "the system is unreliable" into "position 47 needs the repeater moved 600 mm".

Step 4: decide the data outlet before the hardware

The receiver has one interface per unit, so the outlet is a specification decision: CAN 2.0B in 11-bit or 29-bit extended frames into the tractor's controller; RS485 with Modbus RTU (we are the slave, your PLC polls); RS232 UART; or PROFINET through an RS232-to-PROFINET gateway, a separate item. Without a controller, the same data goes to a cab display or over 4G to your platform.

On a J1939 network, plainly: we work in 29-bit extended frames and have deployed J1939-format message sets in construction machinery integrations with major OEMs; the message layout is documented and can be aligned to your DBC. We hold no J1939 conformance certificate and say so rather than imply one.

Worked example: 160 wheels, 20 axles

Run the four steps in order: 160 positions at eight per axle. One receiver addresses up to 256 positions, so the receiver count is not the scale problem — the delivered reference machine splits the 160 across two receivers, each with its own 7-inch display, so neither unit carries the whole list. The chassis permits mounts at the gooseneck and the first axle group; the geometry leaves a dozen radio zones, so twelve repeaters run along the frame.

The order of magnitude, then, is one receiver unit, a double-digit number of repeaters and one cab display — not one receiver per axle, and not 160 of anything except sensors. On a shorter 6- or 8-axle modular trailer the same architecture collapses to one receiver, one or two repeaters and one display. The hardware range is on the products page; the delivered machine is documented on the beam carrier installation page.

Retrofitting a working fleet without stopping it

Most heavy haulage systems we fit are retrofits, because the machine is earning and only free between two jobs. Three things decide whether the installation is a short stop or a project:

  • the permitted mount, agreed before the sensors are ordered
  • the sensor type — internal strap or built-in valve on this class, so the sensor goes in during a tyre change that is already due
  • the harness, routed along the original loom rather than through a new hole in the frame

Do not schedule the retrofit like a new build; schedule it like a maintenance window, and let tyre work and sensor fitting be the same visit.

The numbers to put in the RFQ

ItemValue
Pressure0–1400 kPa gauge (100–1500 kPa absolute), ±7 kPa
Temperatureinternal sensor −40 to +125 °C; external sensor −20 to +85 °C
Wheel positionsup to 256 per receiver
Radio433.92 MHz, licence-free
SealingIP68
InterfacesCAN 2.0B (11-bit or 29-bit extended frame), RS485 with Modbus RTU, RS232 (UART), PROFINET through a gateway
Internal sensor bandsteel band cut to the rim circumference — 1650 mm is the most common truck and bus length, 2500 mm has been supplied where the rim was larger, and any length is a cutting step, not a development
CertificationCE in progress

What to send us

Three items turn this from a site visit into an email: the axle and wheel-position layout, the chassis length, and where the receiver may mount. Add the data outlet — CAN into the tractor controller, a cab display, or 4G to your platform — and the fourth question answers itself. For a retrofit, say when the machine is free.

Send them on the contact page and the answer is a receiver and repeater count, not a brochure. The machine list on the applications page shows how the same method scales from a modular trailer to a beam carrier.