Why a bus project is an integration project, not a product purchase

A bus builder does not want another screen in the cab. It already has a body controller, a

dashboard and a diagnostic port. What it wants from a TPMS is: **four or six numbers and an alarm

flag, on the existing bus, readable by the existing controller.**

So the unit of delivery is not "a kit". It is:

ItemWhat it has to be
Sensors433.92 MHz, one per wheel, external valve or internal band
ReceiverOne node on the vehicle, one interface fitted at build
Message setDocumented, mapped to the body controller's expected IDs
AlarmA decision the controller can act on, not a buzzer nobody hears
EvidenceA CAN log from a real bus, not a bench video

4-wheel and 6-wheel buses are different jobs

On a 4-wheel bus (two axles, single tyres) the map is trivial: 11 / 12 / 21 / 22. One receiver,

four sensors, no repeater in most cases.

On a 6-wheel bus there is usually a tag or pusher axle. Two configurations appear in practice:

  • 6 single tyres → six positions, one sensor each.
  • Rear dual pair → six positions, and the inner tyre needs its own sensor, which is the

detail that turns up late in a project.

What the pairing step looks like on a real bus — front, rear and tag axle, one handheld tool:

Those two clips are the boring part that decides whether the project is finished on time: each

sensor is identified to a position, and the position record matches the drawing.

What to agree with the bus builder before the first unit

1. Which node is the master. Our receiver is a Modbus RTU slave on RS485 or a CAN node —

in both cases the vehicle controller polls us. We do not poll the vehicle.

2. The message set. CAN 2.0B, 11-bit or 29-bit extended. **We have deployed J1939-format

message sets in construction machinery integrations with major OEMs**; for a bus programme we

map to the builder's DBC or parameter list. We do not claim J1939 certification.

3. What the alarm means. Low pressure threshold, high temperature threshold, sensor-missing

timeout — three numbers that must be agreed, not defaults left in a factory menu.

4. Where the receiver physically goes. Not behind the dashboard by default. Low on the chassis,

open, near the axles — otherwise the last wheels in a 6-wheel bus are the ones that suffer.

5. Who owns the wheel map. The wheel map should be a document on the vehicle file, not a

photo on somebody's phone.

Interface reality: one per receiver

A receiver is built with one interface: CAN 2.0B, RS485 (Modbus RTU slave), RS232/UART,

PROFINET via a gateway, or USB-UART. If a project genuinely needs CAN and RS232 at the same time,

that is two receivers or a project-specific build — this is worth settling in the RFQ stage rather

than discovering at the integration bench.

What the bus builder gets that a screen does not give

  • One node and one message set to validate, instead of a second display to mount and power.
  • Each wheel's pressure, temperature, sensor ID and status, on the same bus the diagnostics tool

already reads.

  • A log they can hand to the operator when a tyre is questioned.

FAQ

Can the bus keep its existing dashboard? Yes. The TPMS data goes onto the bus; whether the

builder shows it on the existing display, a new page, or only in diagnostics is their decision.

Do you supply the display too? We can supply 7-inch, dot-matrix and segment displays, but a bus

programme usually does not need one. The receiver is the part that matters.

Is J1939 supported? We support 29-bit extended frames and have deployed J1939-format message

sets; we map to your DBC. We do not claim J1939 conformance certification.

How many wheels can one receiver handle? Up to 256 positions — far beyond a bus, which is the

point: the same receiver part serves a bus, a truck fleet and a 160-wheel beam carrier.

Can we test before the vehicle is built? Yes: bench integration with your controller and our

receiver, using the message set we would ship. That is the cheapest place to find a mapping error.